Tecan Group is responsible for an estimated 185 tonnes of EOL e-waste in 2021

Written by
Reviewed by

Humans generated 57.4 Mn tonnes of e-waste in 2021 and will generate 74 Mn tonnes in 2030 if no actions are taken1. Electronic and electric products have a life span of 4.5 years3. After that, these products turn into e-waste that contains toxic c...

Register to read the full analysis —or— Upgrade to access more features

#reuse #plastic #disposal #E-waste

Actual Direct Impact

Assess the impact materiality of this Topic for Tecan Group

How negative/positive is the impact of Tecan Group for this Topic?

How would you rate the severity of this impact?

Scale (how grave the impact is)

Scope (how widespread the impact is)

Irremediability/Persistence (how difficult it is to counteract the impact)

Share this Analysis


Written by
Reviewed by

Keen to rectify an issue with this analysis?